A gray forced-air furnace with ductwork stands in an unfinished concrete basement surrounded by storage items and clutter.

Furnace Installation in Baltimore, MD

Tell us about the job

Takes about a minute. No obligation.

New system or replacementFurnace or heatingBaltimore city, MD
Step 1 of 2

What ZIP code is the job in?

Gas is the default here

Gas heats 62.1% of homes in Baltimore city. If your old furnace ran on gas, the gas line, the vent, and the fuel supply to the house are already in place.

That makes replacement simpler

A gas furnace going in where one already ran means the contractor is matching existing venting and gas line sizing rather than adding them. That keeps the job closer to a swap than a build-out.

7 months
October through April, your furnace is on duty
28°F
the average winter night it heats against
62%
of homes here heat with gas, so most furnaces here burn gas
80% AFUE
the federal minimum any new unit must meet
Isometric cutaway illustration of a house showing interior rooms with furniture, a furnace unit with a tall flue pipe outside, and ductwork running through the attic.
Your furnace works hardest from November through March.

NOAA nClimDiv, 1991–2020 normals

Furnaces in Baltimore start running in October.

A September install means it's tested and ready before you need it, not after.

Gas here runs $15.55 per million Btu, so the cheapest furnace to run isn't always worth the premium

Heat runs October through April
Winter nights average 28°F
13 winter storms from 2015 to 2024
A standard furnace is built for thisHeat runs seven months here, October through April, with overnight lows averaging 28°F in winter.

Half the homes in Baltimore city were built in 1947 or earlier. A furnace going into a house that old is going into a house that wasn't built with it in mind. The duct run may have been sized for a different system entirely, or added later to fit whatever was there before. None of that means the job is harder. It means the contractor sizing your furnace needs to size it to your house, not just to the model it's replacing. A furnace that's too big for the space will short cycle. One that's too small will run constantly and still leave rooms cold. Getting that right matters more in a house this age than in one built to a modern code.

Any furnace installed here has to clear 80 percent AFUE

Baltimore city falls under zone 4A, and any furnace going in now has to meet the federal minimum of 80 percent AFUE. That floor holds until December 2028, when new furnaces will have to hit 95 percent. A system installed today is yours to run for years past that date, so it's worth asking your contractor where the one you're considering lands. A federal tax credit is available for qualifying high-efficiency equipment, which can offset some of that difference.

Find a contractor
A man in a cap, dark long-sleeve shirt and brown pants carries a canvas tool bag up wooden porch steps toward a navy front door beside a potted shrub.
A gray gas furnace with attached ductwork and piping installed in an unfinished concrete basement.

Get the house measured, not just the furnace

Ask the contractor for a load calculation before they quote a size, not after. That's the step that catches a duct run sized for an old system or a room that was added on later. Skip it and you're trusting the new furnace to match the old one's size, which is the assumption that gets homes like this one wrong.

The old furnace gets disconnected and hauled out

The gas line gets capped off and the old unit gets cut loose from the ducts and the vent before it comes out. A contractor doing a swap removes it as part of the job rather than leaving it behind. Where it ends up after that, whether it's scrapped for the metal or just hauled to a landfill, isn't something you need to manage.

The flue and gas line get checked, not just reused

An old furnace that ran for years doesn't mean its venting is still sized right for a new one. Furnaces vary in how much exhaust they put out and how much gas they draw, so the contractor should check that the existing flue and gas line still fit the new unit instead of assuming last furnace's setup carries over.

An empty unfinished basement containing a forced-air furnace with overhead ductwork, exposed ceiling joists, and a single hanging light bulb.

A high-efficiency gas furnace would save about $100 a year to run in Baltimore compared with a gas furnace.

  • A high-efficiency gas furnace$530 a year
  • A gas furnace$630 a year

Estimates for a typical Baltimore home, from EIA household energy data, Maryland fuel prices and NOAA climate normals. Your home will differ.

Once the new furnace is set and connected, the contractor runs it through a startup check before calling the job done. That means firing the burners, checking that the flame looks right, and confirming the inducer motor and blower both come on when they should. Gas pressure gets checked at the manifold and adjusted if it's off. The contractor also checks the temperature rise across the furnace, which tells them whether the airflow matches what that unit needs to run safely. Last step is usually walking the thermostat settings with you so it's actually heating on the first cold night, not just sitting there installed.